500 50

Annual production solar aluminum alloy border and bracket 6 million sets and 40 million aluminum accessories production line project environmental impact assessment

Time:2021-11-02 00:00:00

Public participation in the first publicity


Jiangsu Sassi Reengneng Technology Co., Ltd. plans to invest 50 million yuan in the construction of 6 million sets of 6 million sets and 40 million aluminum accessories production lines for annual production of solar aluminum alloy border and brackets at 66 Huanghe Road, Funing Economic Development Zone, Jiangsu Province. According to the relevant provisions of the "Environmental Impact Evaluation Public Participation Measures" (Order No. 4 of the Ministry of Ecology and Environment), the relevant information of the environmental impact assessment is publicly publicized, and public opinions are requested. Welcome all sectors of society to actively participate and supervise.


1. The name and summary of the construction project


Project name: annual production of solar aluminum alloy border and bracket 6 million sets and 40 million aluminum accessories production line projects;


Construction unit: Jiangsu Sosi Hot Energy Technology Co., Ltd.;


Construction location: No. 66 Huanghe Road, Funing Economic Development Zone, Jiangsu Province;


Project investment: a total investment of 50 million yuan;


Project scale: The project intends to use 12,000 square meters of existing plant, purchase 97 sets of equipment and other equipment such as heat jet heating furnace, automatic thermal sawing, servo robot, fully automatic CNC processing machine tool, grab robotic robot, etc. After the project is completed, solar aluminum can be produced 6 million sets and 40 million aluminum accessories (solar stent accessories, bicycle accessories, textile accessories, etc.) each with alloy frames and brackets. Production process process: Pure aluminum rod heating -squeezing — quenching — tension straight — sawing box -timeliness — embryo packaging into warehouse — shotplash workshop — bridge surface cleaning -shot blasting pill -blasting — quality shot blasting — quality shot shot shot shotplane — quality shot blasting — quality shot blasting — quality shot blasting -quality Examination-Oxidation workshop — installation-dehydration-alkaline erosion-neutral-anode oxidation-electrolytic color-sealing-drying — unloading inspection packaging-film-saw cutting-border punching-short-edge corner code-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-test-inspection-inspection-test-inspection-test-test-test-test-test-inspection-inspection-inspection-test-test-inspection-inspection-test-inspection-inspection-test-inspection-inspection-inspection-test-inspection- Enter the warehouse.


People from the Department: President Zhu;


Contact number: 13020195555.


2. The name and contact information of the environmental impact assessment agency and contact information of the evaluation work


Unit name: Nanjing Kehong Environmental Protection Technology Co., Ltd.


Unit Address: Room 1006, Building 5, Shuangzha Road, Shuangzha Road, Jianye District, Nanjing City


Lianhe: Chen Gong


Contact number: 025-85280708 Postcode: 210019


3. Environmental impact assessment work procedures and main contents


EIA work procedure: accept the commission → preparation stage work (including data collection, preliminary on -site survey and engineering analysis, environmental information publicity and public participation survey, etc.) → formal working stage (environmental status monitoring, engineering analysis, environmental impact forecast evaluation) → Report The book preparation phase (the summary work results, the initial draft of the report, the environmental information publicity and the public participation investigation, report and report review).


The main content of the environmental assessment work: through engineering analysis and environmental survey, predict the impact of the project construction on the scope and extent of the water, gas, sound, soil, and ecological environment of the project where the project construction is located. It proposes pollution prevention measures in water, gas, sound, solid waste, soil, ecology and other aspects, so that the social, economic benefits and environment of proposed projects will be coordinated, and the scientific basis for the decision -making of engineering construction and environmental management departments.


4. The main matters of public participation opinions


Satisfaction with the current environmental quality status of the project where the project is located, the environmental problems, overall requirements and opinions that are most worried about the project after completion.


See the attachment in details for public participation opinions.


5. The main way to make opinions on the public


The letter (letter is subject to the postmark date), fax, telephone, seminar and other methods to put forward their own opinions.


From now on 10 working days (the letter is based on the postmark date), the public can adopt the method of sending a letter, fax, telephone and other methods to the public to publicize the opinions and views on engineering and environmental assessment. The contact information, the environmental impact assessment unit will truly record the public opinion and suggestions in the "Environmental Impact Report", and reflect the public's valuable opinions and suggestions to the project planning unit, design unit and government environmental protection department. Please give feedback within 10 working days from the date of this announcement.


6. The period of this announcement


This publicity time is ten working days from the date of publicity.


 


Announcement Release Unit: Jiangsu Sosi Hot Energy Technology Co., Ltd.